All markets
MARKET

Construction &Industrial

Fabricated steel is how much of this region’s industrial building gets done — frames, portal structures and light buildings that arrive as components and are put together on site. Every one of those joints is metal to metal, carried at high torque, with nothing else holding the structure together. A joint that stiff relies on the bolt to hold its clamp load, which is why the connection is designed as carefully as the member.

2

PROJECT REFERENCES

2

APPLICATIONS

2

WORK DISCIPLINES

2023

FIRST PROJECT

Construction & Industrial

APPLICATIONS

WHAT KIND OF FACILITY IS IT?
APPLICATION NARRATIVE
02 / 02

Pre-Engineered Buildings & Structural Steel.

Pre-engineered buildings (PEBs) are designed and manufactured before they reach site, then erected in days, which is why they are used wherever capacity is needed quickly.

In a portal frame the haunch and apex connections carry the moment, so their bolts are what give the structure its continuity. Grade and torque are set together there: the bolt’s grade decides the clamp load, and the clamp load decides the tightening.

Pre-Engineered Buildings & Structural Steel

Pre-Engineered Buildings & Structural Steel

PROJECTS IN THIS APPLICATION

1 of 1 project
STATUS
DISCIPLINE

2023

APPROVED

Procurement and Construction of Early Site Works for North Field South (NFS) Onshore Project

VERIFIED APPROVAL

Qatar Gas

Civil & StructuralApproved by end client

Approval document on file

Shared after we verify your project

PRODUCTS APPROVED HERE

Chemical Anchor

2 applications

Threaded Rod (Hot Dip Galvanized)

2 applications

VERIFIED APPROVALS ISSUED BY

End client

1

ACROSS THE GCC

WHEREVER YOU ARE
BUILDING

One team, one standard of documentation and one register of project references — supporting projects across the GCC.

Start a conversation

PROJECT REFERENCES

167 projects since 2014

STANDARD ITEMS

Quoted within a day

NON-STANDARD

Processed in-house or sourced to your drawing

YOUR CONTACT

One named technical contact per project