Buildings &Real Estate
Occupied buildings are where the region’s growth is most visible, and they are built from the same details repeated at scale: the same bracket, the same anchor, a few hundred times. Most of it is fixed into concrete that cured months earlier, where edge distance and the state of the base decide capacity. Then the finishes close over it, and the fixing is inaccessible for the life of the building.
45
PROJECT REFERENCES
6
APPLICATIONS
5
WORK DISCIPLINES
2015
FIRST PROJECT
Buildings & Real EstateAPPLICATIONS
WHAT KIND OF FACILITY IS IT?Commercial & Mixed-Use Towers.
The hardest fixing problem in a tower is at the slab edge, the shallowest and most congested concrete in the structure.
Curtain wall brackets must find room between rebar and still carry wind load back into the frame. Riser containment and MEP supports repeat that same negotiation on every floor, for a few hundred metres of building.

Commercial & Mixed-Use Towers
PROJECTS IN THIS APPLICATION
22 of 22 projects2025
REFERENCE
Al Waab Building 30 & 69
SHK. NASSER BIN HAMAD AL THANI
Project details
Available on request
2025
APPROVED
Design & Build of Interior Fit-Out Works for Existing Darb Lusail Building C1-16/17, Lusail City
Qatari Diar
Approval document on file
Shared after we verify your project
2025
APPROVED
Design & Build of Interior Fit-Out Works for Existing Darb Lusail Building C1-16/17, Lusail City
Qatari Diar
Approval document on file
Shared after we verify your project
2025
APPROVED
Qiddiya-ESA Buildings
Qiddiya Investment Company
Approval document on file
Shared after we verify your project
2025
REFERENCE
Energy City Qatar- Office Building
Al Jawdej Real Estate
Project details
Available on request
2022
APPROVED
Al-Saad Complex Building
Yousuf Mohammed A. Fakhroo
Approval document on file
Shared after we verify your project
2022
REFERENCE
Gewan Island Building Works Package
United Development Company (UDC)
Project details
Available on request
2022
APPROVED
Lusail Plaza Infrastructure, LRT Station, Public Car Park & Landscape
Lusail Real Estate Development Company
Approval document on file
Shared after we verify your project
2022
APPROVED
Gewan Island Building Works Package
United Development Company (UDC)
Approval document on file
Shared after we verify your project
2021
APPROVED
Abu Hamour Shopping Village
Le Miraj Real Estate
Approval document on file
Shared after we verify your project
2021
APPROVED
Design & Build Works for Lusail Plaza Tower Project
Joint Venture (Louis Berger & QPM)
Approval document on file
Shared after we verify your project
2021
REFERENCE
Gewan Island Building Works Package
United Development Company (UDC)
Project details
Available on request
2021
APPROVED
Design & Build Work for Lusail Plaza Tower Plot 3
Lusail Real Estate Development Company
Approval document on file
Shared after we verify your project
2021
APPROVED
Design & Build Work for Lusail Plaza Tower Plot 4
Lusail Real Estate Development Company
Approval document on file
Shared after we verify your project
2021
APPROVED
Gewan Island Building Works Package
United Development Company (UDC)
Approval document on file
Shared after we verify your project
2021
APPROVED
Lusail Plaza Infrastructure, LRT Station, Public Car Park & Landscape
Lusail Real Estate Development Company
Approval document on file
Shared after we verify your project
2021
APPROVED
Design & Build Works for Lusail Plaza Tower Plot 4
Joint Venture (Louis Berger & QPM)
Approval document on file
Shared after we verify your project
2020
APPROVED
Commercial Boulevard (BP18A) Mixed Use Buildings
EllisDon
Approval document on file
Shared after we verify your project
2019
APPROVED
CP7B- Lusail Plaza Infrastructure, LRT Station, Public Car Park & Landscape
Lusail Real Estate Development Company
Approval document on file
Shared after we verify your project
2016
APPROVED
Lusail Marina Com 18 Office Tower - Lusail City
Assets Real Estate Development
Approval document on file
Shared after we verify your project
2016
APPROVED
Abraj Quartier Tower
AKY Real Estate / AL-ORAIQ LLC Real Estate Development
Approval document on file
Shared after we verify your project
2016
APPROVED
Place Vendome Mall
Dorra Group
Approval document on file
Shared after we verify your project
PRODUCTS APPROVED HERE
Hex Nut (Hot Dip Galvanized, Electrogalvanized, Stainless Steel, Self Finish)
6 applications
Flat Washer (Hot Dip Galvanized, Electrogalvanized, Stainless Steel)
6 applications
Hex Bolt (Hot Dip Galvanized, Electrogalvanized, Stainless Steel)
6 applications
Through Bolt (Atlantis C3-L, Zinc Plated, A4 Stainless steel)
6 applications
Dropin Anchor (Atlantis C3-L, Zinc plated, A4 Stainless steel)
5 applications
Consultant
13
End client
4
WHEREVER YOU ARE
BUILDING
One team, one standard of documentation and one register of project references — supporting projects across the GCC.
Start a conversationPROJECT REFERENCES
167 projects since 2014
STANDARD ITEMS
Quoted within a day
NON-STANDARD
Processed in-house or sourced to your drawing
YOUR CONTACT
One named technical contact per project



